The container is prepared for fast telemetry integration without later modification of the base tank.
CTC-1 enables satellite GPS tracking, remote monitoring of tank condition and safety alarms.
The customer can choose basic preparation or a complete monitoring package, depending on the project and budget.
For rental fleets, long-distance transport and premium configurations, CTC-1 can be defined as part of the standard configuration.
CTC-1 can be installed on all containers we manufacture, in both 40 ft and 20 ft ISO versions.
Tracking of location, pressure, level and operational history for LNG logistics.
Telemetry preparation and monitoring can also be applied to our hydrogen containers.
CTC-1 can also be installed on helium containers when the customer requires additional control of the fleet and equipment.
Also applicable to GAS 5 containers for the transport of LNG / methane, nitrogen, argon, ethylene and oxygen.
If you already use your own fleet-management system, the container can be supplied only with preparation for later integration.
If you need full control of the route and product condition, the CTC-1 package is supplied as a ready-to-use telemetry option.
Satellite communication, the cloud platform and alarms are clearly defined through the scope of supply and service model.
The system is suitable for different monitoring levels: from GPS location to pressure, level, temperature and API integration.
The location and condition of the tank are available through satellite communication and the cloud system.
Geo-fencing and alarms help control deviations from the planned route or location.
Route and parameter history provide verifiable data for the operator, customer, insurance provider and internal quality control.
Display of pressure, level, temperature and route reduces uncertainty during transport.
LEach project can be prepared so that smart monitoring is installed immediately or later, without changing the base vessel.
Defined installation location, bracket, protected position and service access to the device.
Preparation for M20 cable glands and safe cable routes to sensors and instrumentation.
Possibility to connect pressure, level and temperature measurements via 4–20 mA signals where applicable.
The documentation clearly states preparation for the optional CTC-1 Smart Monitoring System.
The equipment owner can see the location, condition and usage history of each container.
Long road, rail and sea routes receive location, alarms and data history.
Industry, islands, mines, data centers and remote locations receive verifiable delivery reliability.
In more complex systems, monitoring becomes part of safe process management.